[1]
S. K. Thong, W. K. M. Sapuan, and L. K. Hun, “The Cost Comparison of High-Rise Foundation for Mixed Bored Piles and Micro Piles Proposal with Solely Bored Piles Proposal at Project Rumawip Residensi Gembira 737, Kuala Lumpur”, IJIRM, vol. 10, no. 3, Apr. 2026, doi: 10.63646/ECUV3135.